Interior removal of gypsum drywall from wood or metal stud walls and ceilings using hand tools (hammer, flat bar, utility knife) and an oscillating multi-tool. Covers prep, utility shutoff, containment, removal from floor level and stepladders, fastener removal, debris hauling to the dumpster, and cleanup. Work in occupied or older buildings (built before 1980) requires a lead and asbestos check before starting.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Walk the area and check for lead paint, asbestos, and hidden utilities

    • Asbestos in joint compound or texture, or lead in old paint, released as dustHigh
      • If the building is older than 1980, get the drywall and paint tested before anyone starts tearing out.
      • If tests come back positive, stop. Only a licensed abatement crew removes that material.
      • Supervisor confirms results in writing and tells the crew before work starts.
    • Live wires, gas lines, and water pipes hidden inside the wallHigh
      • Mark outlets, switches, fixtures, and plumbing on the wall with tape or marker so everyone knows where lines run.
      • Cut a small inspection hole first and look inside with a flashlight before opening the wall.
  2. 2. Shut off and lock out power, water, and gas to the work area

    • Electric shock from cutting or prying into an energized 120V or 240V circuitHigh
      • Turn off the breakers feeding the walls you will remove, then put a lock and tag on the panel.
      • Test every outlet and switch in the area with a non-contact voltage tester before you cut.
      • Run temporary power from a GFCI-protected cord from another circuit, never from the dead area.
    • Flooding or gas leak from a cut or damaged pipeMedium
      • Close the water and gas valves for the area and open a faucet to drain pressure.
      • Know where the main water and gas shutoffs are before demo starts.
  3. 3. Set up containment, floor protection, and dust control

    • Gypsum dust spreading to other rooms and the HVAC systemMedium
      • Hang 6-mil plastic sheeting with zipper doors to close off the work area.
      • Turn off the HVAC and cover supply and return vents with plastic and tape.
      • Set up a negative-air fan with a HEPA filter blowing out a window.
    • Tripping on plastic, cords, and floor protectionLow
      • Tape all edges of floor protection flat and run cords along the walls.
  4. 4. Cut and remove drywall from walls at floor level

    • Breathing gypsum and joint compound dustMedium
      • Remove sheets in large pieces with a flat bar instead of smashing them with a hammer.
      • Lightly mist the drywall with a pump sprayer before breaking it.
      • Wear an N95 respirator at minimum during tear-out.
    • Cuts from utility knife blades, oscillating tool, and sharp metal studs or corner beadMedium
      • Cut away from your body and keep your other hand out of the cut path.
      • Set the oscillating blade depth to the drywall thickness, usually 1/2 in or 5/8 in, so you do not hit wires or pipes.
      • Wear cut-resistant gloves when handling metal studs and corner bead.
    • Debris and dust flying into eyesMedium
      • Keep coworkers at least 6 ft away from the person prying.
      • Wear safety goggles, not just glasses, when dust is heavy.
  5. 5. Remove ceiling and upper wall drywall from a stepladder

    • Falling from a 6-ft fiberglass stepladderHigh
      • Use a rolling scaffold with locked wheels and guardrails for large ceilings instead of a ladder.
      • Open the stepladder fully, lock the spreaders, and set it on clear, level floor.
      • Never stand on the top step or top cap, and keep three points of contact.
      • Inspect the ladder before use and tag out any with cracked rails or bad feet.
    • Ceiling sheets and debris falling on workers belowMedium
      • Keep everyone out of the area directly under the ceiling section being removed.
      • Pull ceiling pieces down in small sections and let them drop away from you.
      • Wear a hard hat during ceiling removal.
    • Old insulation falling into eyes and onto skinMedium
      • Wear goggles, long sleeves, and an N95 when opening ceilings with insulation above.
  6. 6. Pull screws, nails, and leftover drywall from studs

    • Puncture wounds from nails and screws in debris and on the floorMedium
      • Pull or bend over every fastener as you go so none stick out.
      • Sweep the floor with a magnetic sweeper at the end of each section.
      • Wear boots with puncture-resistant soles.
    • Hand and wrist strain from repeated prying and pullingLow
      • Use a cordless drill to back out screws instead of prying them.
      • Rotate tasks between crew members every hour.
  7. 7. Bag debris and haul it to the dumpster

    • Back strain from lifting heavy, wet drywall pieces and full bagsMedium
      • Use a wheelbarrow, debris cart, or chute instead of carrying loads by hand.
      • Fill bags only half full and keep them under 50 lb.
      • Lift with your legs and get help for anything awkward.
    • Trips and falls on stairs and blocked exits while carrying debrisMedium
      • Keep hallways, stairs, and exits clear of debris piles at all times.
      • Carry loads small enough that you can see your feet and hold the handrail.
  8. 8. Clean up the work area and take down containment

    • Dust getting back into the air during sweepingMedium
      • Clean with a HEPA vacuum. Do not dry sweep or use compressed air.
      • Mist plastic sheeting, then fold it inward on itself before bagging.
      • Keep your respirator on until cleanup is finished.
    • Contact with exposed wires when restoring powerMedium
      • Cap all loose wires and confirm everyone is clear before the person who placed the lock removes it.

Required PPE

  • Safety goggles or glasses — ANSI Z87.1 safety glasses at all times; sealed goggles during tear-out and ceiling work.
  • Respirator — NIOSH-approved N95 minimum during tear-out and cleanup; fit-tested half-mask with P100 filters if dust is heavy.
  • Hard hat — During ceiling removal and when anyone is working overhead.
  • Cut-resistant gloves — When using utility knives and handling metal studs, corner bead, and debris.
  • Work boots — Puncture-resistant soles; safety toe recommended.
  • Long sleeves and pants — To protect skin from insulation and dust; disposable coveralls if dust is heavy.
  • Hearing protection — Earplugs when running the oscillating tool or reciprocating saw for long periods.

Training

  • Site safety orientation on demolition hazards, hidden utilities, and this JHA.
  • Lockout and tagging of circuits, including how to use a voltage tester.
  • Ladder safety training by a competent person.
  • Respirator training, medical clearance, and fit test before using a tight-fitting respirator.
  • Lead and asbestos awareness: how to recognize suspect materials and when to stop work.

Emergency

If someone gets shocked: do not touch them. Shut off the breaker or main power first. Call 911 and give the site address. If they are not breathing, start CPR and send someone to meet the ambulance. For a fall or deep cut, call 911, keep the person still, and apply pressure to bleeding with a clean cloth.