Skip to content
Independent software · not affiliated with OSHAenes
HardHat Binder

Job Hazard Analysis · Carpentry & Framing

Job Hazard Analysis: Deck construction

Building a wood deck attached to a house: layout, footings, posts, ledger, beams, joists, decking, stairs, and railings. Covers decks with walking surfaces 6 ft or more above grade. Work uses an auger, pneumatic nailer, circular saw, miter saw, drill/impact driver, and 6-ft to 8-ft ladders.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Lay out the deck, confirm utility locates, and set up power and tools.

    • Hitting buried gas, electric, or water lines when digging.High
      • Call 811 before digging and wait for all lines to be marked.
      • Move footing locations away from marked lines when the design allows.
      • Hand dig within 18 in. of any marked line.
    • Electric shock from damaged extension cords or ungrounded outlets.Medium
      • Plug all tools into a GFCI outlet or portable GFCI.
      • Inspect cords before use; tag out and remove any with cuts or missing ground pins.
      • Keep cords out of puddles and off walkways.
    • Contact with overhead power lines when carrying long lumber or ladders.High
      • Locate the service drop and overhead lines before work starts and point them out to the crew.
      • Keep ladders, lumber, and tools at least 10 ft from power lines.
      • Use fiberglass ladders only.
  2. 2. Dig footing holes and pour concrete footings.

    • Power auger kickback or twisting when the bit hits a rock or root.Medium
      • Use a towable or frame-mounted auger with a torque arm instead of a handheld one when possible.
      • Run handheld augers with two workers, feet planted, and the kill switch within reach.
      • Keep loose clothing and gloves away from the spinning bit.
    • Chemical burns to skin and eyes from wet concrete.Medium
      • Mix in a wheelbarrow or mixer, not by hand.
      • Keep clean water on site to rinse skin and eyes right away.
      • Wear alkali-resistant gloves, safety glasses, and long sleeves; wash off any concrete on skin.
    • Back strain from lifting 60-80 lb concrete bags.Medium
      • Use a hand truck or wheelbarrow to move bags.
      • Lift with your legs and get help for heavy loads.
    • Tripping or twisting an ankle in open holes.Low
      • Cover or flag open holes until they are poured.
  3. 3. Install the ledger board on the house and set the posts.

    • Fall from a ladder while installing the ledger.Medium
      • Work from a rolling platform or scaffold instead of a ladder when the ledger is long or high.
      • Set extension ladders at a 4-to-1 angle on firm, level ground; open stepladders fully and lock the spreaders.
      • Keep three points of contact and do not stand on the top two steps.
    • Drilling into hidden wiring or plumbing inside the house wall.Medium
      • Check inside the house for panels, outlets, and pipes behind the ledger line before drilling.
      • Shut off the circuit at the panel if wiring is near the drilling area.
    • Posts or a heavy ledger falling on workers before they are braced.Medium
      • Brace each post in two directions right after setting it.
      • Use two workers to lift and hold the ledger while it is fastened.
  4. 4. Frame the beams and joists.

    • Falling 6 ft or more while walking on beams or open joists.High
      • Build as much framing as possible from the ground, then raise it into place.
      • Install temporary guardrails on open sides, or use a personal fall arrest system tied to a rated anchor.
      • Lay temporary plywood over joists for a work surface; do not walk the top of joists.
    • Nail gun puncture wounds from accidental firing or nails passing through wood.High
      • Use full sequential trigger nailers only.
      • Keep your free hand at least 12 in. from the nailing point and never point the nailer at anyone.
      • Disconnect the air hose before clearing jams, moving, or handing off the nailer.
      • Wear safety glasses at all times when nailing.
    • Being struck by dropped lumber, hangers, or tools from above.Medium
      • Keep workers out from under overhead framing work.
      • Wear a hard hat when anyone is working overhead.
  5. 5. Cut and install the deck boards.

    • Cuts and kickback from the circular saw.High
      • Make repeat cuts on a miter saw with a stand when possible.
      • Check that the lower blade guard returns freely; never pin it back.
      • Support boards on both sides of the cut and keep your body out of the blade line.
      • Unplug the saw before changing blades.
    • Falling off the open edge of the deck.High
      • Keep temporary guardrails in place on open sides 6 ft or more above grade until permanent railings are installed.
      • Work facing the edge, not backing toward it.
    • Wood dust, splinters, and noise from cutting treated or composite boards.Low
      • Cut outdoors downwind of the crew and use saws with dust bags when available.
      • Wear gloves, safety glasses, hearing protection, and a dust mask when cutting.
      • Wash hands before eating after handling treated lumber.
    • Knee and back strain from kneeling and bending.Low
      • Rotate tasks and take short stretch breaks.
      • Wear knee pads.
  6. 6. Build the stairs and install the railings.

    • Falling from the deck edge or stair opening before railings are complete.High
      • Remove temporary guardrails one section at a time only as permanent rail goes in.
      • Barricade the stair opening until stairs and handrails are installed.
      • Use fall arrest when working outside the rail line at 6 ft or more.
    • Cuts from the miter saw when cutting balusters and stringers.Medium
      • Clamp short pieces; keep hands at least 6 in. from the blade.
      • Let the blade stop fully before raising it.
    • Ladder tip-over on uneven ground near the stairs.Medium
      • Level the ground or use ladder levelers; never stack blocks under ladder feet.
  7. 7. Clean up the site and store tools and materials.

    • Stepping on nails or tripping over scrap lumber and cords.Medium
      • Pick up scrap and bent nails throughout the day, not just at the end.
      • Sweep the area with a magnet for loose nails and screws.
      • Coil cords and hoses and keep paths clear.
    • Lumber stacks falling over.Low
      • Stack lumber on level blocking, crossed or banded, no higher than you can safely reach.

Required PPE

  • Safety glasses — ANSI Z87.1 at all times on site.
  • Hard hat — When anyone is working overhead or framing above you.
  • Work gloves — Leather for lumber; alkali-resistant nitrile for concrete.
  • Safety-toe work boots — Puncture-resistant soles; rubber boots when pouring concrete.
  • Hearing protection — Earplugs or earmuffs when running saws, nailers, or the auger.
  • Dust mask — N95 when cutting treated or composite boards or dumping dry concrete mix.
  • Full-body harness and lanyard — When working 6 ft or more above grade without guardrails.
  • Knee pads — When installing deck boards.

Training

  • Fall protection training covering guardrails, harness use, and anchors before working at 6 ft or more.
  • Ladder safety training: setup, angle, and three points of contact.
  • Hands-on training for pneumatic nailers, including sequential trigger use and clearing jams.
  • Safe use of circular saws, miter saws, and power augers by a trained person.
  • Hazard communication on wet concrete and treated lumber, including where to find the SDS.
  • A competent person on site to inspect fall protection, ladders, and guardrails.

Emergency

If a worker falls: stop work, do not move the injured person unless they are in danger, call 911 and give the full site address, then give first aid until help arrives. For a nail puncture, do not pull the nail out; keep it still and get medical care.