Job Hazard Analysis · Excavation & Sitework
Job Hazard Analysis: Foundation excavation
Digging a foundation hole or footing trench with a tracked excavator or backhoe, then hand-finishing the bottom so footings can be formed. Covers locating utilities, digging, protecting workers from cave-ins (sloping, benching, or trench box), entering the excavation, and securing the site at end of day. A competent person must be on site and inspect the excavation daily and after rain or other changes. Excavations 20 ft or deeper need a protective system designed by a registered professional engineer.
Published 2026-10-23
A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.
Steps, hazards and controls
1. Plan the dig: call 811, mark utilities, and pick the protective system
- Hitting buried gas, electric, water, or fiber linesHigh
- Call 811 before digging and wait for all utilities to respond and mark the ground.
- Walk the site with the competent person and check that paint and flags match the plans.
- Hand-dig or vacuum-excavate to expose lines inside the tolerance zone before using the bucket.
- Cave-in from wrong soil type or no protective planHigh
- Have the competent person classify the soil (Type A, B, or C) before digging.
- Choose sloping, benching, or a trench box rated for the depth before work starts. If in doubt, treat soil as Type C.
- Overhead power lines in the excavator's reachHigh
- Locate overhead lines and keep the boom at least 10 ft away from lines up to 50 kV.
- Call the utility to de-energize or cover the lines if you can't keep clearance, and assign a dedicated spotter.
2. Set up the site: barricades, traffic control, and equipment check
- Workers or public struck by trucks and equipmentHigh
- Set cones, fence, or barricades to keep people out of the work zone.
- Plan one-way haul routes and use a spotter when trucks back up.
- Wear a high-visibility Class 2 vest at all times.
- Equipment failure from bad brakes, hydraulics, or backup alarmMedium
- Do the pre-shift walk-around on the excavator and loader: tracks, hoses, leaks, horn, backup alarm, seat belt.
- Tag out any machine with a defect and don't run it until repaired.
3. Dig the foundation with the excavator and place spoil
- Struck or crushed by the excavator swing or bucketHigh
- Mark the swing radius with cones or tape and keep everyone outside it.
- Make eye contact and get a signal from the operator before walking near the machine.
- Never stand under a loaded bucket or near a truck being loaded.
- Spoil pile or equipment collapsing the edgeHigh
- Keep spoil, materials, and equipment at least 2 ft back from the edge.
- Keep heavy equipment back from the edge or use stop logs so wheels and tracks can't roll in.
- Loud engine noiseMedium
- Keep cab doors and windows closed while operating.
- Wear earplugs or earmuffs when working near running equipment.
4. Install the protective system: slope, bench, or set the trench box
- Cave-in while the protective system is going inHigh
- Set and adjust the trench box from outside the excavation; nobody goes in until it is in place.
- Cut slopes and benches to the angle the competent person set for the soil type.
- Use only trench boxes with the manufacturer's tabulated data on site and don't exceed rated depth.
- Pinch points and swinging loads when rigging the trench boxMedium
- Inspect chains and shackles before lifting; use tag lines to guide the box.
- Keep hands off the box while it moves and wear work gloves.
5. Inspect and enter the excavation
- Cave-in from water, cracks, or changed conditionsHigh
- The competent person inspects before each shift, after rain, and after any change. Look for cracks, bulges, water, and sloughing.
- Pump out standing water before entry; get out right away if you see the walls move.
- Falling while climbing in or outMedium
- In excavations 4 ft or deeper, place a ladder within 25 ft of every worker.
- Extend the ladder 3 ft above the edge, tie it off, and face the ladder with 3 points of contact.
- Bad air (low oxygen or fumes) in deep or low areasMedium
- Test the air with a gas monitor before entry in excavations over 4 ft where bad air could build up, like near landfills, fuel tanks, or sewer lines.
- Keep gas-powered pumps and compactors out of the hole or vent the exhaust away.
6. Hand-finish the bottom and lay out footings
- Struck by the bucket while working near it in the holeHigh
- Stop the machine and lower the bucket to the ground before anyone works within its reach.
- Use one person to give signals to the operator.
- Back strain from shoveling and lifting formsMedium
- Let the machine do the heavy cuts and use the bucket to lower forms and rebar.
- Rotate shovel work and lift with your legs; get help for loads over 50 lb.
- Heat or cold stress in the holeMedium
- Provide cool water, shade, and rest breaks; give new workers time to get used to the heat.
- Watch each other for dizziness, cramps, or confusion and report it right away.
7. Secure the site at end of day and clean up
- Workers or public falling into the open excavationHigh
- Put up fence or barricades around the whole excavation before leaving.
- Cover or barricade any wells, pits, or shafts.
- Use guardrails or fall protection on walkways over excavations 6 ft or deeper.
- Trips on tools, hoses, and loose debrisLow
- Pick up tools, coil hoses, and keep walkways clear.
- Park equipment away from the edge, bucket down, keys removed.
Required PPE
- Hard hat — ANSI Z89.1, worn at all times on site.
- High-visibility vest — Class 2 or higher, at all times around equipment and traffic.
- Safety glasses — ANSI Z87.1, at all times.
- Steel- or composite-toe boots — Waterproof work boots for wet holes.
- Work gloves — Leather or cut-resistant for shoveling, rigging, and handling forms.
- Hearing protection — Earplugs or earmuffs when near running excavators, compactors, or pumps.
Training
- Competent person trained in soil classification, protective systems, and excavation inspection.
- Excavation hazard awareness for all crew: cave-in signs, safe entry, and ladder use.
- Operators trained and authorized on the specific excavator, backhoe, or loader.
- Hand signals and spotter training for workers guiding equipment.
- Fall protection training for anyone working at excavation edges 6 ft or deeper.
- Heat illness prevention and first aid/CPR for at least one person on site.
Emergency
If there is a cave-in: stop all equipment and call 911 right away. Give the site address and say it is a trench collapse. Do NOT jump in to dig out a buried worker; more soil can fall. Keep everyone and machines back from the edge, and send someone to the road to guide rescue crews. If a utility line is hit, shut down, move everyone away, and call 911 and the utility.
Official sources
- 29 CFR 1926.651 — Excavations — specific requirementsecfr.gov
- 29 CFR 1926.652 — Requirements for protective systemsecfr.gov
- 29 CFR 1926.600 — Motor vehicles and mechanized equipment — equipmentecfr.gov
- 29 CFR 1926.602 — Material handling equipmentecfr.gov
- 29 CFR 1926.21 — Safety training and educationecfr.gov
- 29 CFR 1926.1053 — Laddersecfr.gov
- 29 CFR 1926.501 — Duty to have fall protectionecfr.gov
- OSHA — Heat — hazard recognition and preventionosha.gov
Make this JHA for your own job