Job Hazard Analysis · Excavation & Sitework

Job Hazard Analysis: Foundation excavation

Digging a foundation hole or footing trench with a tracked excavator or backhoe, then hand-finishing the bottom so footings can be formed. Covers locating utilities, digging, protecting workers from cave-ins (sloping, benching, or trench box), entering the excavation, and securing the site at end of day. A competent person must be on site and inspect the excavation daily and after rain or other changes. Excavations 20 ft or deeper need a protective system designed by a registered professional engineer.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Plan the dig: call 811, mark utilities, and pick the protective system

    • Hitting buried gas, electric, water, or fiber linesHigh
      • Call 811 before digging and wait for all utilities to respond and mark the ground.
      • Walk the site with the competent person and check that paint and flags match the plans.
      • Hand-dig or vacuum-excavate to expose lines inside the tolerance zone before using the bucket.
    • Cave-in from wrong soil type or no protective planHigh
      • Have the competent person classify the soil (Type A, B, or C) before digging.
      • Choose sloping, benching, or a trench box rated for the depth before work starts. If in doubt, treat soil as Type C.
    • Overhead power lines in the excavator's reachHigh
      • Locate overhead lines and keep the boom at least 10 ft away from lines up to 50 kV.
      • Call the utility to de-energize or cover the lines if you can't keep clearance, and assign a dedicated spotter.
  2. 2. Set up the site: barricades, traffic control, and equipment check

    • Workers or public struck by trucks and equipmentHigh
      • Set cones, fence, or barricades to keep people out of the work zone.
      • Plan one-way haul routes and use a spotter when trucks back up.
      • Wear a high-visibility Class 2 vest at all times.
    • Equipment failure from bad brakes, hydraulics, or backup alarmMedium
      • Do the pre-shift walk-around on the excavator and loader: tracks, hoses, leaks, horn, backup alarm, seat belt.
      • Tag out any machine with a defect and don't run it until repaired.
  3. 3. Dig the foundation with the excavator and place spoil

    • Struck or crushed by the excavator swing or bucketHigh
      • Mark the swing radius with cones or tape and keep everyone outside it.
      • Make eye contact and get a signal from the operator before walking near the machine.
      • Never stand under a loaded bucket or near a truck being loaded.
    • Spoil pile or equipment collapsing the edgeHigh
      • Keep spoil, materials, and equipment at least 2 ft back from the edge.
      • Keep heavy equipment back from the edge or use stop logs so wheels and tracks can't roll in.
    • Loud engine noiseMedium
      • Keep cab doors and windows closed while operating.
      • Wear earplugs or earmuffs when working near running equipment.
  4. 4. Install the protective system: slope, bench, or set the trench box

    • Cave-in while the protective system is going inHigh
      • Set and adjust the trench box from outside the excavation; nobody goes in until it is in place.
      • Cut slopes and benches to the angle the competent person set for the soil type.
      • Use only trench boxes with the manufacturer's tabulated data on site and don't exceed rated depth.
    • Pinch points and swinging loads when rigging the trench boxMedium
      • Inspect chains and shackles before lifting; use tag lines to guide the box.
      • Keep hands off the box while it moves and wear work gloves.
  5. 5. Inspect and enter the excavation

    • Cave-in from water, cracks, or changed conditionsHigh
      • The competent person inspects before each shift, after rain, and after any change. Look for cracks, bulges, water, and sloughing.
      • Pump out standing water before entry; get out right away if you see the walls move.
    • Falling while climbing in or outMedium
      • In excavations 4 ft or deeper, place a ladder within 25 ft of every worker.
      • Extend the ladder 3 ft above the edge, tie it off, and face the ladder with 3 points of contact.
    • Bad air (low oxygen or fumes) in deep or low areasMedium
      • Test the air with a gas monitor before entry in excavations over 4 ft where bad air could build up, like near landfills, fuel tanks, or sewer lines.
      • Keep gas-powered pumps and compactors out of the hole or vent the exhaust away.
  6. 6. Hand-finish the bottom and lay out footings

    • Struck by the bucket while working near it in the holeHigh
      • Stop the machine and lower the bucket to the ground before anyone works within its reach.
      • Use one person to give signals to the operator.
    • Back strain from shoveling and lifting formsMedium
      • Let the machine do the heavy cuts and use the bucket to lower forms and rebar.
      • Rotate shovel work and lift with your legs; get help for loads over 50 lb.
    • Heat or cold stress in the holeMedium
      • Provide cool water, shade, and rest breaks; give new workers time to get used to the heat.
      • Watch each other for dizziness, cramps, or confusion and report it right away.
  7. 7. Secure the site at end of day and clean up

    • Workers or public falling into the open excavationHigh
      • Put up fence or barricades around the whole excavation before leaving.
      • Cover or barricade any wells, pits, or shafts.
      • Use guardrails or fall protection on walkways over excavations 6 ft or deeper.
    • Trips on tools, hoses, and loose debrisLow
      • Pick up tools, coil hoses, and keep walkways clear.
      • Park equipment away from the edge, bucket down, keys removed.

Required PPE

  • Hard hat — ANSI Z89.1, worn at all times on site.
  • High-visibility vest — Class 2 or higher, at all times around equipment and traffic.
  • Safety glasses — ANSI Z87.1, at all times.
  • Steel- or composite-toe boots — Waterproof work boots for wet holes.
  • Work gloves — Leather or cut-resistant for shoveling, rigging, and handling forms.
  • Hearing protection — Earplugs or earmuffs when near running excavators, compactors, or pumps.

Training

  • Competent person trained in soil classification, protective systems, and excavation inspection.
  • Excavation hazard awareness for all crew: cave-in signs, safe entry, and ladder use.
  • Operators trained and authorized on the specific excavator, backhoe, or loader.
  • Hand signals and spotter training for workers guiding equipment.
  • Fall protection training for anyone working at excavation edges 6 ft or deeper.
  • Heat illness prevention and first aid/CPR for at least one person on site.

Emergency

If there is a cave-in: stop all equipment and call 911 right away. Give the site address and say it is a trench collapse. Do NOT jump in to dig out a buried worker; more soil can fall. Keep everyone and machines back from the edge, and send someone to the road to guide rescue crews. If a utility line is hit, shut down, move everyone away, and call 911 and the utility.