Job Hazard Analysis · Excavation & Sitework
Job Hazard Analysis: Laying pipe in trench
Crew lays storm, sewer, or water pipe in an open trench dug by an excavator. Trench depth may be 4 to 20 ft. Work includes a trench box or shoring, lowering pipe with the excavator, setting bedding and grade, joining pipe, and backfilling with a plate or jumping-jack compactor. Expect soft or wet soil, buried utilities, traffic near the trench, and outdoor heat or cold.
Published 2026-10-23
A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.
Steps, hazards and controls
1. Pre-shift check: competent person inspects trench, spoil piles, and utility locate marks
- Hidden cracks, bulging walls, or water that can lead to a cave-inHigh
- Competent person inspects the trench before anyone enters, at the start of every shift, and after rain or any change.
- If there is water, cracks, sloughing, or bulging, nobody enters until it is fixed.
- Pump out standing water before work starts.
- Contact with buried gas, power, or water linesHigh
- Confirm 811 locate tickets are current and marks are visible before digging.
- Hand dig or vacuum excavate within the tolerance zone of marked lines.
- If you smell gas or hit a line, stop, shut down equipment, and move everyone away.
- Low oxygen or toxic gas in trenches over 4 ft deep near sewers, landfills, or fuel tanksMedium
- Test the air with a calibrated 4-gas meter before entry and keep testing while people are inside.
- Keep gas engines, pumps, and generators out of the trench and downwind.
2. Set the trench box or shoring, keep spoil back, and place the access ladder
- Cave-in in trenches 5 ft or deeper without a protective systemHigh
- Use a trench box, shoring, or sloping chosen by the competent person for the soil type and depth.
- Use the box only within the manufacturer's tabulated depth rating; keep the data sheet on site.
- Never enter the trench outside the box or shoring.
- Spoil, rocks, or tools falling from the edge onto workersMedium
- Keep spoil piles and materials at least 2 ft back from the trench edge.
- Extend the trench box above the trench edge or use a retaining barrier.
- Falls into the trench and falls while climbing in or outMedium
- Place an extension ladder in trenches 4 ft or deeper so no one walks more than 25 ft to reach it.
- Extend the ladder 3 ft above the edge and tie it off; keep it inside the box.
- Put barricades or cones around the open trench and cover holes left overnight.
3. Lower pipe into the trench with the excavator and rigging
- Struck or crushed by suspended pipe or swinging bucketHigh
- Inspect slings, chokers, and the bucket hook before use; remove damaged rigging.
- Workers stay out of the box and clear of the load while pipe is lowered; use a tag line.
- Use one designated signal person with agreed hand signals.
- Never stand under a suspended load.
- Excavator or loaded truck near the edge causing a collapse or tippingHigh
- Keep equipment back from the edge as far as the competent person sets; use stop logs or barricades.
- Use backup alarms and a spotter when equipment moves near workers.
- Struck by traffic or site vehicles while working at the edgeMedium
- Set up traffic control with cones, signs, and a flagger when working near a roadway.
- Wear a high-visibility vest at all times.
4. Place bedding stone and set grade with a laser inside the box
- Stone dumped from the bucket landing on workersMedium
- Workers step to the far end of the box before the operator dumps bedding.
- Operator dumps only on the signal person's signal.
- Back strain from shoveling and raking stoneLow
- Have the excavator spread most of the stone; rotate shovel work.
- Lift with your legs and keep loads close to your body.
- Laser beam in the eyesLow
- Never look into the pipe laser; set it so the beam is not at eye level.
5. Join pipe sections and cut pipe to length
- Hands or feet pinched between pipe ends or between pipe and boxMedium
- Use a come-along or pipe puller instead of pushing pipe home with the bucket when possible.
- Keep hands off the bell end and away from the joint while the pipe is pushed.
- Wear steel-toe boots and work gloves.
- Silica dust when cutting concrete pipe with a cut-off sawHigh
- Cut pipe outside the trench whenever possible.
- Use a cut-off saw with a water feed running the whole cut.
- Wear a respirator if cutting more than the allowed time or where water control is not effective.
- Saw kickback, noise, and flying chipsMedium
- Check the blade guard and blade rating before use; never remove the guard.
- Support the pipe so the cut does not pinch the blade.
- Wear safety glasses, face shield, and earplugs while cutting.
6. Backfill and compact around the pipe
- Carbon monoxide from a gas compactor in the trenchHigh
- Use an electric or battery compactor, or a compaction wheel on the excavator, in deep or narrow trenches.
- If a gas compactor is used, run the 4-gas meter and leave the trench at the first alarm.
- Vibration and noise from the jumping-jack or plate compactorMedium
- Rotate operators about every 30 minutes.
- Wear earplugs or earmuffs and anti-vibration gloves.
- Feet crushed by the compactor or by backfill dumped from the bucketMedium
- Stay clear of the area where the bucket dumps; dump only on signal.
- Wear steel-toe boots.
7. Move the trench box forward, then clean up at the end of the shift
- Caught or crushed while the box is dragged or liftedHigh
- Everyone gets out of the trench before the box is moved.
- Inspect box pins, spreaders, and lift points before each move.
- Tripping over pipe, hoses, and tools; open trench left overnightMedium
- Stack pipe on level ground and chock it so it cannot roll.
- Pick up hoses, cords, and tools at the end of each shift.
- Barricade or plate any open trench before leaving the site.
Required PPE
- Hard hat — ANSI Z89.1, worn at all times on site and in the trench.
- High-visibility vest — Class 2 minimum at all times; Class 3 near roadway traffic or at night.
- Safety glasses — ANSI Z87.1 at all times; add a face shield when cutting pipe.
- Steel-toe boots — Steel or composite toe; rubber steel-toe boots in wet trenches.
- Work gloves — Leather or cut-resistant for handling pipe and rigging; anti-vibration for compactors.
- Hearing protection — Earplugs or earmuffs when running saws, compactors, or near the excavator.
- Respirator — N95 or half-face with P100 filters when cutting concrete pipe if required by the silica control plan; fit test required.
Training
- A competent person trained to classify soil, inspect trenches, and choose protective systems must be on site.
- All crew trained in trench hazards: cave-ins, trench box use, ladder access, and atmospheric hazards.
- Excavator operators trained and evaluated on the machine they run.
- Signal person and riggers trained in hand signals, sling inspection, and safe lifting.
- Workers who cut concrete pipe trained on the silica hazard and the written exposure control plan.
- Workers using a 4-gas meter trained to bump test it and respond to alarms.
Emergency
Cave-in: Stop all work and shut off equipment near the trench. Call 911 and give the exact site address and trench depth. Do NOT jump in to dig; rescuers can be buried by a second collapse. Keep everyone and all machines back from the edge, and meet the fire department at the entrance.
Official sources
- 29 CFR 1926.651 — Excavations — specific requirementsecfr.gov
- 29 CFR 1926.652 — Requirements for protective systemsecfr.gov
- 29 CFR 1926.21 — Safety training and educationecfr.gov
- 29 CFR 1926.600 — Motor vehicles and mechanized equipment — equipmentecfr.gov
- 29 CFR 1926.602 — Material handling equipmentecfr.gov
- 29 CFR 1926.1053 — Laddersecfr.gov
- 29 CFR 1926.1153 — Respirable crystalline silicaecfr.gov
- 29 CFR 1926.201 — Signaling (flaggers)ecfr.gov
Make this JHA for your own job
Describe the task and the site. You get a JHA like this on your letterhead, in English and Spanish, with a crew sign-off sheet — preview free.
General information, not legal advice. Templates and examples should be reviewed by a competent person before use. HardHat Binder is not affiliated with or endorsed by OSHA.