Job Hazard Analysis: Laying pipe in trench

Crew lays storm, sewer, or water pipe in an open trench dug by an excavator. Trench depth may be 4 to 20 ft. Work includes a trench box or shoring, lowering pipe with the excavator, setting bedding and grade, joining pipe, and backfilling with a plate or jumping-jack compactor. Expect soft or wet soil, buried utilities, traffic near the trench, and outdoor heat or cold.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Pre-shift check: competent person inspects trench, spoil piles, and utility locate marks

    • Hidden cracks, bulging walls, or water that can lead to a cave-inHigh
      • Competent person inspects the trench before anyone enters, at the start of every shift, and after rain or any change.
      • If there is water, cracks, sloughing, or bulging, nobody enters until it is fixed.
      • Pump out standing water before work starts.
    • Contact with buried gas, power, or water linesHigh
      • Confirm 811 locate tickets are current and marks are visible before digging.
      • Hand dig or vacuum excavate within the tolerance zone of marked lines.
      • If you smell gas or hit a line, stop, shut down equipment, and move everyone away.
    • Low oxygen or toxic gas in trenches over 4 ft deep near sewers, landfills, or fuel tanksMedium
      • Test the air with a calibrated 4-gas meter before entry and keep testing while people are inside.
      • Keep gas engines, pumps, and generators out of the trench and downwind.
  2. 2. Set the trench box or shoring, keep spoil back, and place the access ladder

    • Cave-in in trenches 5 ft or deeper without a protective systemHigh
      • Use a trench box, shoring, or sloping chosen by the competent person for the soil type and depth.
      • Use the box only within the manufacturer's tabulated depth rating; keep the data sheet on site.
      • Never enter the trench outside the box or shoring.
    • Spoil, rocks, or tools falling from the edge onto workersMedium
      • Keep spoil piles and materials at least 2 ft back from the trench edge.
      • Extend the trench box above the trench edge or use a retaining barrier.
    • Falls into the trench and falls while climbing in or outMedium
      • Place an extension ladder in trenches 4 ft or deeper so no one walks more than 25 ft to reach it.
      • Extend the ladder 3 ft above the edge and tie it off; keep it inside the box.
      • Put barricades or cones around the open trench and cover holes left overnight.
  3. 3. Lower pipe into the trench with the excavator and rigging

    • Struck or crushed by suspended pipe or swinging bucketHigh
      • Inspect slings, chokers, and the bucket hook before use; remove damaged rigging.
      • Workers stay out of the box and clear of the load while pipe is lowered; use a tag line.
      • Use one designated signal person with agreed hand signals.
      • Never stand under a suspended load.
    • Excavator or loaded truck near the edge causing a collapse or tippingHigh
      • Keep equipment back from the edge as far as the competent person sets; use stop logs or barricades.
      • Use backup alarms and a spotter when equipment moves near workers.
    • Struck by traffic or site vehicles while working at the edgeMedium
      • Set up traffic control with cones, signs, and a flagger when working near a roadway.
      • Wear a high-visibility vest at all times.
  4. 4. Place bedding stone and set grade with a laser inside the box

    • Stone dumped from the bucket landing on workersMedium
      • Workers step to the far end of the box before the operator dumps bedding.
      • Operator dumps only on the signal person's signal.
    • Back strain from shoveling and raking stoneLow
      • Have the excavator spread most of the stone; rotate shovel work.
      • Lift with your legs and keep loads close to your body.
    • Laser beam in the eyesLow
      • Never look into the pipe laser; set it so the beam is not at eye level.
  5. 5. Join pipe sections and cut pipe to length

    • Hands or feet pinched between pipe ends or between pipe and boxMedium
      • Use a come-along or pipe puller instead of pushing pipe home with the bucket when possible.
      • Keep hands off the bell end and away from the joint while the pipe is pushed.
      • Wear steel-toe boots and work gloves.
    • Silica dust when cutting concrete pipe with a cut-off sawHigh
      • Cut pipe outside the trench whenever possible.
      • Use a cut-off saw with a water feed running the whole cut.
      • Wear a respirator if cutting more than the allowed time or where water control is not effective.
    • Saw kickback, noise, and flying chipsMedium
      • Check the blade guard and blade rating before use; never remove the guard.
      • Support the pipe so the cut does not pinch the blade.
      • Wear safety glasses, face shield, and earplugs while cutting.
  6. 6. Backfill and compact around the pipe

    • Carbon monoxide from a gas compactor in the trenchHigh
      • Use an electric or battery compactor, or a compaction wheel on the excavator, in deep or narrow trenches.
      • If a gas compactor is used, run the 4-gas meter and leave the trench at the first alarm.
    • Vibration and noise from the jumping-jack or plate compactorMedium
      • Rotate operators about every 30 minutes.
      • Wear earplugs or earmuffs and anti-vibration gloves.
    • Feet crushed by the compactor or by backfill dumped from the bucketMedium
      • Stay clear of the area where the bucket dumps; dump only on signal.
      • Wear steel-toe boots.
  7. 7. Move the trench box forward, then clean up at the end of the shift

    • Caught or crushed while the box is dragged or liftedHigh
      • Everyone gets out of the trench before the box is moved.
      • Inspect box pins, spreaders, and lift points before each move.
    • Tripping over pipe, hoses, and tools; open trench left overnightMedium
      • Stack pipe on level ground and chock it so it cannot roll.
      • Pick up hoses, cords, and tools at the end of each shift.
      • Barricade or plate any open trench before leaving the site.

Required PPE

  • Hard hat — ANSI Z89.1, worn at all times on site and in the trench.
  • High-visibility vest — Class 2 minimum at all times; Class 3 near roadway traffic or at night.
  • Safety glasses — ANSI Z87.1 at all times; add a face shield when cutting pipe.
  • Steel-toe boots — Steel or composite toe; rubber steel-toe boots in wet trenches.
  • Work gloves — Leather or cut-resistant for handling pipe and rigging; anti-vibration for compactors.
  • Hearing protection — Earplugs or earmuffs when running saws, compactors, or near the excavator.
  • Respirator — N95 or half-face with P100 filters when cutting concrete pipe if required by the silica control plan; fit test required.

Training

  • A competent person trained to classify soil, inspect trenches, and choose protective systems must be on site.
  • All crew trained in trench hazards: cave-ins, trench box use, ladder access, and atmospheric hazards.
  • Excavator operators trained and evaluated on the machine they run.
  • Signal person and riggers trained in hand signals, sling inspection, and safe lifting.
  • Workers who cut concrete pipe trained on the silica hazard and the written exposure control plan.
  • Workers using a 4-gas meter trained to bump test it and respond to alarms.

Emergency

Cave-in: Stop all work and shut off equipment near the trench. Call 911 and give the exact site address and trench depth. Do NOT jump in to dig; rescuers can be buried by a second collapse. Keep everyone and all machines back from the edge, and meet the fire department at the entrance.