Install or replace interior ceiling and wall light fixtures (LED troffers, surface-mount, recessed cans, wall sconces) on 120V or 277V branch circuits. Work is done from 6-ft or 8-ft fiberglass stepladders in finished or unfinished spaces. Includes de-energizing the circuit, removing old fixtures, mounting, wiring, testing, and cleanup.
Published 2026-10-23
A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.
Steps, hazards and controls
1. Review the job, stage fixtures and materials, and inspect ladders and tools.
- Back strain lifting boxed fixtures (2x4 troffers can be 20–30 lb and awkward).Low
- Use a cart or dolly to move multiple boxes.
- Stage fixtures close to each install location to cut down on carrying.
- Lift with your legs and get a second person for long or bulky fixtures.
- Damaged ladder, cords, or tools failing during use.Medium
- Inspect each ladder before use for cracked rails, loose rungs, missing feet, and a working spreader lock.
- Tag damaged ladders or tools 'Do Not Use' and remove them from the site.
- Check cord insulation and plug on drills and extension cords; use GFCI protection for all cord-and-plug tools.
2. De-energize the circuit, apply lockout/tagout, and verify it is dead.
- Electric shock from a live circuit: wrong breaker, mislabeled panel, shared neutral, or multiple circuits in one box.High
- Never work the fixture hot. Turn off the breaker and lock it with your personal lock and tag.
- Test your voltage tester on a known live source, test every conductor in the box, then test the tester again (live-dead-live).
- Look for extra circuits, switch legs, and shared neutrals in the box; lock out every circuit feeding it.
- Treat 277V lighting as high risk: only qualified electricians work on it.
- Arc flash or shock while working in an energized panel to find the breaker.Medium
- Do not remove the panel dead-front just to find a breaker; use the directory and a circuit tracer.
- Stand to the side of the panel when operating breakers and keep the panel cover closed.
- Wear safety glasses and keep your face out of line with the breaker.
3. Set up the fiberglass stepladder at the fixture location.
- Fall from the ladder from overreaching, standing on the top cap or top step, or ladder tipping.High
- Pick a ladder tall enough that you work below the second step from the top; get a taller ladder or rolling scaffold if not.
- Open the stepladder fully, lock the spreaders, and set it on firm, level floor.
- Keep your belt buckle between the rails and move the ladder instead of reaching.
- Keep 3 points of contact climbing and use a tool pouch or hoist line, not your hands, to carry tools.
- People or carts bumping the ladder in hallways, doorways, or occupied areas.Medium
- Block off the area under the ladder with cones or caution tape.
- Lock or guard doors that open toward the ladder.
- Use a spotter in busy traffic areas.
4. Remove the old fixture and prepare the box, ceiling grid, or mounting location.
- Dust, debris, and ceiling tile particles falling into eyes when opening ceilings or drilling overhead.Medium
- Use a drill dust cup or shroud when drilling into drywall or tablaroca overhead.
- Wear ANSI Z87.1 safety glasses with side shields; add goggles for heavy overhead debris.
- Wear an N95 dust mask for dusty ceilings, voluntary use unless the competent person requires more.
- Old fixture dropping or breaking fluorescent tubes, causing cuts and mercury exposure.Medium
- Remove tubes and lenses first and hand them down; do not carry them up or down the ladder.
- Support the old fixture before cutting the last screw or wire.
- Store old tubes intact in a marked box for recycling; clean broken tubes with a damp paper towel and bag it, do not vacuum.
- Wear cut-resistant gloves when handling sheet-metal housings.
- Hidden live wiring or other circuits above the ceiling.Medium
- Use a non-contact voltage tester on any cable or box above the ceiling before touching it.
- Do not cut or move cables you did not lock out.
5. Mount the bracket and lift the new fixture into place.
- Losing balance or dropping the fixture while holding it overhead on the ladder.High
- Use two people for fixtures over 20 lb or wider than 2 ft: one on the ladder, one handing up.
- Use the fixture's safety hook or hanger to hold it while you wire it.
- Hang troffers with support wires to the structure as the manufacturer requires.
- Keep the area below clear of people.
- Cuts and puncture wounds from sheet-metal edges, screws, and power drivers.Low
- Use the right bit and keep your free hand away from the driving path.
- Wear cut-resistant gloves when handling housings and brackets.
6. Make the wire connections and ground the fixture.
- Shock if the circuit was re-energized by someone else or a second source is present.High
- Keep your lock and tag on the breaker until the connections are done; only you remove your lock.
- Re-test the conductors if you left the work and came back.
- Use insulated screwdrivers and strippers in good condition.
- Loose connections or a missing ground leaving the fixture housing energized later.Medium
- Use listed wire connectors sized for the wire count and gauge; tug-test every splice.
- Connect the equipment ground to the fixture's green screw or ground lead every time.
- Keep wires from being pinched by the canopy or housing.
7. Remove lockout, restore power, and test the fixture.
- Shock or arc if someone is still working on the circuit when it is re-energized.High
- Verify everyone is clear and all locks on that circuit belong to workers who are done.
- Announce out loud before turning the breaker back on.
- Stand to the side of the panel when closing the breaker.
- Fixture failure or short (sparks, tripped breaker) at first power-up.Low
- If the breaker trips, lock it out again and find the fault before resetting it.
- Stay off the ladder and away from the fixture during the first power-up.
8. Clean up packaging, old fixtures, and debris, and put away ladders and tools.
- Trips on cardboard, wire scraps, and cords in walkways.Low
- Break down boxes and remove packaging as you go, not just at the end of the day.
- Pick up wire scraps and coil extension cords out of walkways.
- Cuts from broken lamps and sharp metal in trash.Low
- Put old fluorescent tubes and ballasts in marked recycling containers, separate from regular trash.
- Wear cut-resistant gloves when handling scrap metal and broken glass.
Required PPE
- Safety glasses — ANSI Z87.1 with side shields at all times; goggles when drilling or removing dirty ceiling tile overhead.
- Cut-resistant work gloves — When handling sheet-metal housings, brackets, and broken glass; remove for fine wiring if they reduce your grip.
- Hard hat — On active construction sites or where overhead work or falling objects are present.
- Work boots — Slip-resistant soles; electrical hazard (EH) rated preferred.
- Dust mask — N95 when opening dusty ceilings or drilling drywall overhead.
- Insulated hand tools — Rated 1000V screwdrivers and strippers for all wiring work.
Training
- Qualified electrician or apprentice working under direct supervision of a qualified electrician.
- Lockout/tagout procedure and live-dead-live voltage testing.
- Ladder safety training by a competent person, including stepladder selection and setup.
- Safe use of power drills and drivers and GFCI protection.
- Handling and disposal of fluorescent lamps and ballasts.
Emergency
If someone is shocked: do not touch them. Shut off the breaker or push them free with a dry non-conductive object. Call 911 and give the site address. Start CPR if they are not breathing and use an AED if available. Anyone shocked goes to a doctor, even if they feel fine. For a ladder fall, do not move the person unless they are in danger; call 911.
Official sources
- 29 CFR 1926.416 — Electrical — general requirementsecfr.gov
- 29 CFR 1926.417 — Lockout and tagging of circuitsecfr.gov
- 29 CFR 1926.405 — Wiring methods, components, and equipmentecfr.gov
- 29 CFR 1926.1053 — Laddersecfr.gov
- 29 CFR 1926.300 — Hand and power tools — general requirementsecfr.gov
- 29 CFR 1926.102 — Eye and face protectionecfr.gov
- 29 CFR 1926.25 — Housekeepingecfr.gov
- 29 CFR 1926.21 — Safety training and educationecfr.gov
Make this JHA for your own job
Describe the task and the site. You get a JHA like this on your letterhead, in English and Spanish, with a crew sign-off sheet — preview free.
General information, not legal advice. Templates and examples should be reviewed by a competent person before use. HardHat Binder is not affiliated with or endorsed by OSHA.