Install a new residential or light-commercial load center or panelboard (typically 100–400A, 120/240V or 208Y/120V). Includes mounting the enclosure, cutting knockouts, setting conduit, pulling and terminating feeders and branch circuits, grounding and bonding, and energizing. Assumes work near existing energized services or tie-ins with the utility or existing building power.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Plan the job and de-energize: review drawings, locate all power sources, and lock out and tag out the feeding breaker or service disconnect.

    • Electric shock or arc flash from a feeder or service that is still energized or back-fed by a generator or solar system.High
      • Plan the work so all terminations are done de-energized. Do not work hot unless the competent person has a written plan for it.
      • Identify every source: utility service, generators, solar, UPS, and transfer switches. Open and lock each one.
      • Each worker puts a personal lock and a 'Do Not Operate' tag on the disconnect. Only the person who placed a lock removes it.
      • Test before touch: check your CAT III/IV meter on a known live source, test every conductor phase-to-phase and phase-to-ground, then recheck the meter.
      • Wear arc-rated clothing, a face shield, and voltage-rated gloves with leather protectors while testing for absence of voltage.
    • Utility service conductors that cannot be de-energized by the crew (line side of meter or main).High
      • Schedule a utility disconnect or meter pull before tying in. Never pull a meter yourself unless the utility allows it.
      • Treat the line-side lugs as live at all times. Cover them with insulating barriers or rubber blankets.
  2. 2. Set up the work area: barricade the area, set lighting, and position the 6-ft or 8-ft fiberglass stepladder.

    • Fall from a stepladder while mounting or wiring the top of the panel.Medium
      • Use a fiberglass ladder only, never aluminum, around electrical work.
      • Inspect the ladder before use. Open it fully and lock the spreaders on firm, level ground.
      • Do not stand on the top step or top cap. Keep three points of contact and carry tools in a pouch.
    • Other trades walking into the work area or turning on equipment.Medium
      • Set caution tape or cones around the panel area and post a 'Danger – Electrical Work' sign.
      • Tell the GC and other trades which circuits are locked out and for how long.
    • Trips over cords, wire reels, and debris in a dim area.Low
      • Set portable LED work lights on a GFCI-protected circuit. Route cords along walls.
      • Keep wire reels and boxes out of walkways.
  3. 3. Mount the panel enclosure: lift it into place, drill anchor holes, and fasten it to the wall or backboard.

    • Back strain or crushed fingers lifting a heavy panel or panelboard (50–150 lb).Medium
      • Remove the interior and cover first to lighten the can before lifting.
      • Use two people or a panel lift for panelboards over 50 lb. Lift with your legs.
      • Wear cut-resistant gloves and keep fingers clear of the mounting edge.
    • Drilling into a wall that hides live wiring, gas lines, or water pipes.Medium
      • Scan the wall with a stud finder or wire tracer before drilling. Check drawings for hidden lines.
      • Use a drill with a double-insulated or grounded cord on a GFCI.
    • Silica dust and noise when hammer-drilling into concrete or block.Medium
      • Use a hammer drill with a dust shroud and HEPA vacuum, or a drill with built-in dust extraction.
      • Never dry-sweep or blow the dust with compressed air. Vacuum it with HEPA.
      • Wear safety glasses and earplugs while drilling.
  4. 4. Cut knockouts and install conduit, connectors, and fittings into the enclosure.

    • Cuts from sharp metal edges, knockout slugs, and freshly cut EMT.Medium
      • Use a hydraulic or ratchet knockout punch set instead of a hammer and screwdriver.
      • Ream every cut end of conduit and install bushings before pulling wire.
      • Wear cut-resistant gloves when handling cut metal.
    • Eye injury from metal chips when drilling or cutting with a band saw or reciprocating saw.Medium
      • Keep saw guards in place and secure the conduit in a vise or stand before cutting.
      • Wear safety glasses with side shields at all times.
  5. 5. Pull feeders and branch-circuit conductors into the panel.

    • Strain or hand injury pulling large feeders (e.g., 4/0 aluminum or 500 kcmil copper).Medium
      • Use a cable puller or tugger for large feeders, and wire-pulling lubricant.
      • Assign one person to feed the reel and one to pull, and use agreed hand signals or radios.
      • Stand clear of the pull rope line in case it snaps.
    • Fish tape contacting live parts in an existing panel or junction box.High
      • Confirm every box along the run is de-energized and locked out before fishing.
      • Use a non-conductive fiberglass or nylon fish tape near any equipment that could be live.
  6. 6. Terminate conductors, install breakers, and make grounding and bonding connections. Torque lugs to manufacturer specs.

    • Shock or arc flash from contact with line-side lugs or a circuit that was not locked out.High
      • Re-verify absence of voltage at the panel before touching any conductor, after any break, and at the start of each shift.
      • Keep line-side lugs covered with insulating barriers until final tie-in.
      • Use insulated 1000V-rated screwdrivers, nut drivers, and torque tools.
      • Remove rings, watches, and metal jewelry.
    • Loose or under-torqued connections that overheat or cause a fire later.Medium
      • Use a calibrated torque screwdriver or wrench and follow the torque values on the panel label.
      • Have a second worker check terminations, grounding, and neutral-ground bonding before closing the panel.
    • Cuts to hands from wire strippers, utility knives, and sharp conductor ends.Low
      • Use cable strippers or a hook-blade knife and cut away from your body.
      • Wear cut-resistant gloves when stripping large conductors.
  7. 7. Inspect, close up, and energize: install the dead front, remove locks per procedure, and energize the panel.

    • Arc flash when closing the main breaker or disconnect onto a fault.High
      • Before energizing, check for tools and scraps left inside, and do insulation-resistance and continuity tests.
      • Turn off all branch breakers first, then close the main. Turn branches on one at a time.
      • Install the dead front before energizing. Stand to the side of the disconnect and turn your face away when operating it.
      • Wear arc-rated clothing, face shield, and voltage-rated gloves while switching.
    • Someone still working on a circuit when power is restored.High
      • Do a head count and verbal all-clear with every crew member before any lock is removed.
      • Each worker removes only their own lock and tag.
  8. 8. Clean up: label circuits, remove scraps, and store tools and materials.

    • Slips, trips, and cuts from wire scraps, knockout slugs, and packaging.Low
      • Pick up scraps and slugs as you work. Put sharp scrap in a metal bucket.
      • Vacuum drill dust with a HEPA vacuum and remove tape and barricades last.
    • Mislabeled circuits leading to future shock for the next worker.Medium
      • Fill out the panel directory accurately and verify each label by switching the breaker and testing the load.

Required PPE

  • Safety glasses — ANSI Z87.1 with side shields at all times.
  • Hard hat — Class E (electrical) hard hat when overhead hazards exist or required by site.
  • Arc-rated clothing and face shield — Arc-rated long-sleeve shirt, pants, and arc-rated face shield and balaclava when testing, switching, or working near exposed live parts.
  • Voltage-rated rubber insulating gloves with leather protectors — Class 0 (1000V) minimum. Air-test before each use and check the test date.
  • Cut-resistant work gloves — When handling sheet metal, cut conduit, and stripping wire. Not for live work.
  • Safety-toe boots — Electrical hazard (EH) rated, at all times.
  • Hearing protection — Earplugs or earmuffs when hammer-drilling or cutting conduit.

Training

  • Qualified electrician (journeyman or apprentice under direct supervision) trained to recognize and avoid electrical hazards.
  • Lockout/tagout procedure training, including test-before-touch with a meter.
  • Arc flash awareness and proper use, inspection, and care of arc-rated PPE and rubber gloves.
  • Ladder safety training by a competent person.
  • Silica exposure awareness for workers drilling into concrete or masonry.
  • First aid and CPR for at least one crew member on site.

Emergency

If someone is shocked: do not touch them. Shut off power at the disconnect or push them clear with a dry non-conductive object. Call 911 and give the exact site address. Start CPR if they are not breathing and use an AED if available. Cool arc-flash burns with clean water. Notify the supervisor right away.