Install a new residential or light-commercial load center or panelboard (typically 100–400A, 120/240V or 208Y/120V). Includes mounting the enclosure, cutting knockouts, setting conduit, pulling and terminating feeders and branch circuits, grounding and bonding, and energizing. Assumes work near existing energized services or tie-ins with the utility or existing building power.
Published 2026-10-23
A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.
Steps, hazards and controls
1. Plan the job and de-energize: review drawings, locate all power sources, and lock out and tag out the feeding breaker or service disconnect.
- Electric shock or arc flash from a feeder or service that is still energized or back-fed by a generator or solar system.High
- Plan the work so all terminations are done de-energized. Do not work hot unless the competent person has a written plan for it.
- Identify every source: utility service, generators, solar, UPS, and transfer switches. Open and lock each one.
- Each worker puts a personal lock and a 'Do Not Operate' tag on the disconnect. Only the person who placed a lock removes it.
- Test before touch: check your CAT III/IV meter on a known live source, test every conductor phase-to-phase and phase-to-ground, then recheck the meter.
- Wear arc-rated clothing, a face shield, and voltage-rated gloves with leather protectors while testing for absence of voltage.
- Utility service conductors that cannot be de-energized by the crew (line side of meter or main).High
- Schedule a utility disconnect or meter pull before tying in. Never pull a meter yourself unless the utility allows it.
- Treat the line-side lugs as live at all times. Cover them with insulating barriers or rubber blankets.
2. Set up the work area: barricade the area, set lighting, and position the 6-ft or 8-ft fiberglass stepladder.
- Fall from a stepladder while mounting or wiring the top of the panel.Medium
- Use a fiberglass ladder only, never aluminum, around electrical work.
- Inspect the ladder before use. Open it fully and lock the spreaders on firm, level ground.
- Do not stand on the top step or top cap. Keep three points of contact and carry tools in a pouch.
- Other trades walking into the work area or turning on equipment.Medium
- Set caution tape or cones around the panel area and post a 'Danger – Electrical Work' sign.
- Tell the GC and other trades which circuits are locked out and for how long.
- Trips over cords, wire reels, and debris in a dim area.Low
- Set portable LED work lights on a GFCI-protected circuit. Route cords along walls.
- Keep wire reels and boxes out of walkways.
3. Mount the panel enclosure: lift it into place, drill anchor holes, and fasten it to the wall or backboard.
- Back strain or crushed fingers lifting a heavy panel or panelboard (50–150 lb).Medium
- Remove the interior and cover first to lighten the can before lifting.
- Use two people or a panel lift for panelboards over 50 lb. Lift with your legs.
- Wear cut-resistant gloves and keep fingers clear of the mounting edge.
- Drilling into a wall that hides live wiring, gas lines, or water pipes.Medium
- Scan the wall with a stud finder or wire tracer before drilling. Check drawings for hidden lines.
- Use a drill with a double-insulated or grounded cord on a GFCI.
- Silica dust and noise when hammer-drilling into concrete or block.Medium
- Use a hammer drill with a dust shroud and HEPA vacuum, or a drill with built-in dust extraction.
- Never dry-sweep or blow the dust with compressed air. Vacuum it with HEPA.
- Wear safety glasses and earplugs while drilling.
4. Cut knockouts and install conduit, connectors, and fittings into the enclosure.
- Cuts from sharp metal edges, knockout slugs, and freshly cut EMT.Medium
- Use a hydraulic or ratchet knockout punch set instead of a hammer and screwdriver.
- Ream every cut end of conduit and install bushings before pulling wire.
- Wear cut-resistant gloves when handling cut metal.
- Eye injury from metal chips when drilling or cutting with a band saw or reciprocating saw.Medium
- Keep saw guards in place and secure the conduit in a vise or stand before cutting.
- Wear safety glasses with side shields at all times.
5. Pull feeders and branch-circuit conductors into the panel.
- Strain or hand injury pulling large feeders (e.g., 4/0 aluminum or 500 kcmil copper).Medium
- Use a cable puller or tugger for large feeders, and wire-pulling lubricant.
- Assign one person to feed the reel and one to pull, and use agreed hand signals or radios.
- Stand clear of the pull rope line in case it snaps.
- Fish tape contacting live parts in an existing panel or junction box.High
- Confirm every box along the run is de-energized and locked out before fishing.
- Use a non-conductive fiberglass or nylon fish tape near any equipment that could be live.
6. Terminate conductors, install breakers, and make grounding and bonding connections. Torque lugs to manufacturer specs.
- Shock or arc flash from contact with line-side lugs or a circuit that was not locked out.High
- Re-verify absence of voltage at the panel before touching any conductor, after any break, and at the start of each shift.
- Keep line-side lugs covered with insulating barriers until final tie-in.
- Use insulated 1000V-rated screwdrivers, nut drivers, and torque tools.
- Remove rings, watches, and metal jewelry.
- Loose or under-torqued connections that overheat or cause a fire later.Medium
- Use a calibrated torque screwdriver or wrench and follow the torque values on the panel label.
- Have a second worker check terminations, grounding, and neutral-ground bonding before closing the panel.
- Cuts to hands from wire strippers, utility knives, and sharp conductor ends.Low
- Use cable strippers or a hook-blade knife and cut away from your body.
- Wear cut-resistant gloves when stripping large conductors.
7. Inspect, close up, and energize: install the dead front, remove locks per procedure, and energize the panel.
- Arc flash when closing the main breaker or disconnect onto a fault.High
- Before energizing, check for tools and scraps left inside, and do insulation-resistance and continuity tests.
- Turn off all branch breakers first, then close the main. Turn branches on one at a time.
- Install the dead front before energizing. Stand to the side of the disconnect and turn your face away when operating it.
- Wear arc-rated clothing, face shield, and voltage-rated gloves while switching.
- Someone still working on a circuit when power is restored.High
- Do a head count and verbal all-clear with every crew member before any lock is removed.
- Each worker removes only their own lock and tag.
8. Clean up: label circuits, remove scraps, and store tools and materials.
- Slips, trips, and cuts from wire scraps, knockout slugs, and packaging.Low
- Pick up scraps and slugs as you work. Put sharp scrap in a metal bucket.
- Vacuum drill dust with a HEPA vacuum and remove tape and barricades last.
- Mislabeled circuits leading to future shock for the next worker.Medium
- Fill out the panel directory accurately and verify each label by switching the breaker and testing the load.
Required PPE
- Safety glasses — ANSI Z87.1 with side shields at all times.
- Hard hat — Class E (electrical) hard hat when overhead hazards exist or required by site.
- Arc-rated clothing and face shield — Arc-rated long-sleeve shirt, pants, and arc-rated face shield and balaclava when testing, switching, or working near exposed live parts.
- Voltage-rated rubber insulating gloves with leather protectors — Class 0 (1000V) minimum. Air-test before each use and check the test date.
- Cut-resistant work gloves — When handling sheet metal, cut conduit, and stripping wire. Not for live work.
- Safety-toe boots — Electrical hazard (EH) rated, at all times.
- Hearing protection — Earplugs or earmuffs when hammer-drilling or cutting conduit.
Training
- Qualified electrician (journeyman or apprentice under direct supervision) trained to recognize and avoid electrical hazards.
- Lockout/tagout procedure training, including test-before-touch with a meter.
- Arc flash awareness and proper use, inspection, and care of arc-rated PPE and rubber gloves.
- Ladder safety training by a competent person.
- Silica exposure awareness for workers drilling into concrete or masonry.
- First aid and CPR for at least one crew member on site.
Emergency
If someone is shocked: do not touch them. Shut off power at the disconnect or push them clear with a dry non-conductive object. Call 911 and give the exact site address. Start CPR if they are not breathing and use an AED if available. Cool arc-flash burns with clean water. Notify the supervisor right away.
Official sources
- 29 CFR 1926.416 — Electrical — general requirementsecfr.gov
- 29 CFR 1926.417 — Lockout and tagging of circuitsecfr.gov
- 29 CFR 1926.404 — Wiring design and protectionecfr.gov
- 29 CFR 1926.405 — Wiring methods, components, and equipmentecfr.gov
- 29 CFR 1926.1053 — Laddersecfr.gov
- 29 CFR 1926.1153 — Respirable crystalline silicaecfr.gov
- 29 CFR 1926.102 — Eye and face protectionecfr.gov
- 29 CFR 1926.21 — Safety training and educationecfr.gov
Make this JHA for your own job
Describe the task and the site. You get a JHA like this on your letterhead, in English and Spanish, with a crew sign-off sheet — preview free.
General information, not legal advice. Templates and examples should be reviewed by a competent person before use. HardHat Binder is not affiliated with or endorsed by OSHA.