Job Hazard Analysis: Gutter installation

Removing old gutters and installing new seamless aluminum gutters and downspouts along the eaves of a 1- or 2-story building. Work is done from extension ladders, using a truck-mounted gutter forming machine, cordless drills, snips, and sealant.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Walk the site and set up ladders

    • Contact with overhead power lines or the service drop while raising a ladderHigh
      • Locate all overhead lines and the service drop before unloading ladders.
      • Keep ladders, gutters, and tools at least 10 ft from power lines. Call the utility to de-energize or cover lines if you cannot keep 10 ft.
      • Use fiberglass extension ladders only. No aluminum ladders on this job.
      • Two workers raise and lower every extension ladder.
    • Ladder slides out or tips on soft, sloped, or wet groundHigh
      • Set the ladder on firm, level footing; use ladder levelers on slopes, never blocks or bricks.
      • Set the ladder at a 4-to-1 angle: 1 ft out for every 4 ft up.
      • Use a standoff stabilizer so the ladder does not rest on the gutter or fascia.
      • Inspect the ladder for cracked rails, bent rungs, and worn feet before use. Tag and remove damaged ladders.
  2. 2. Remove old gutters and downspouts

    • Fall from ladder while pulling spikes and prying gutters looseHigh
      • Move the ladder instead of reaching. Keep your belt buckle between the rails.
      • Do not stand on the top 3 rungs. Keep 3 points of contact while climbing.
      • Cut long old sections into short pieces on the ladder so you are not fighting a 30-ft gutter.
    • Falling gutter pieces, nails, and debris striking workers belowMedium
      • Set up a drop zone with cones or caution tape under the work area. Keep homeowners and crew out.
      • Call out before dropping anything. Lower long pieces with a rope instead of throwing them.
      • Wear a hard hat in the drop zone.
    • Cuts from sharp, torn metal edgesMedium
      • Handle old gutters by the back edge and wear cut-resistant gloves.
  3. 3. Measure and form seamless gutter with the machine

    • Hands caught in rollers or the shear of the gutter forming machineHigh
      • Keep all guards in place. Never feed coil or clear a jam with the machine running.
      • Turn off and unplug the machine before clearing jams or changing coil.
      • Only trained workers run the machine. No loose gloves, sleeves, or jewelry near rollers.
    • Long gutter sections swinging into people, cars, or the streetMedium
      • Park so the run-out table points away from traffic and sidewalks. Cone off the area.
      • Use one worker per 10 ft of gutter to carry long sections.
  4. 4. Lift and hang the gutter on the fascia

    • Fall from ladder while carrying and positioning long gutter sectionsHigh
      • Do not carry gutters up the ladder in your hands. Climb first, then have the ground crew pass the section up or use a hand line.
      • Use one ladder and one worker at each end, plus a middle worker for runs over 30 ft.
      • Lift on a count so all workers move together. Stop work in winds strong enough to catch the gutter.
      • If work is done from the roof edge on a 2-story building, use a personal fall arrest system tied to a rated anchor.
    • Drill bit and screw injuries; hand-arm strain from overhead drillingLow
      • Use a cordless impact driver with a magnetic bit. Keep your free hand away from the screw path.
      • Inspect tools before use; take damaged tools out of service.
    • Heat stress on hot days and hot metal surfacesMedium
      • Schedule south- and west-facing runs for the morning. Give new workers lighter duty for their first days.
      • Drink water every 15–20 minutes and take shade breaks. Watch each other for dizziness, cramps, or confusion.
  5. 5. Install downspouts, end caps, and seal joints

    • Skin and eye irritation and vapors from gutter sealantLow
      • Read the SDS and label for the sealant before use.
      • Wear nitrile gloves and safety glasses while sealing. Clean skin with the product the SDS lists, not solvent.
    • Cuts from snips and crimped downspout edgesMedium
      • Cut downspouts on a sawhorse at ground level, not on the ladder.
      • Wear cut-resistant gloves and file or fold sharp edges.
    • Eye injury from metal shavings when drilling outlets and rivetsMedium
      • Wear safety glasses at all times. Drill outlets on the ground before hanging when possible.
  6. 6. Clean up and take down ladders

    • Puncture wounds and trips from scrap metal, screws, and old spikes on the groundMedium
      • Pick up scrap as you go and put it straight into the trailer or dumpster.
      • Sweep the work area with a magnetic sweeper before leaving.
    • Power line contact while lowering and carrying laddersHigh
      • Retract the ladder fully before moving it. Carry it level with two workers, watching overhead.

Required PPE

  • Safety glasses (ANSI Z87.1) — At all times, especially when drilling, cutting, and sealing.
  • Cut-resistant gloves — When handling gutter, coil, and downspouts. Remove near machine rollers.
  • Nitrile gloves — When applying sealant.
  • Hard hat — For anyone working below ladders or in the drop zone.
  • Slip-resistant work boots — At all times, for good grip on ladder rungs.
  • Personal fall arrest system (harness, lanyard, anchor) — Required when working from the roof edge 6 ft or more above the ground.
  • High-visibility vest — When working near the street or driveway traffic.

Training

  • Ladder safety training by a competent person: setup, inspection, 4-to-1 angle, 3 points of contact.
  • Fall protection training for anyone who works from the roof or uses a harness.
  • Overhead power line awareness and the 10-ft clearance rule.
  • Hands-on training on the gutter forming machine, including jam clearing with power off.
  • Hazard communication training on the sealant SDS.
  • Heat illness recognition and first aid.

Emergency

If someone falls or is shocked: stop all work. If a power line is involved, do not touch the person or the ladder; keep everyone back. Call 911 and give the full site address. Do not move a fallen worker unless they are in danger. Give first aid and send someone to the street to guide the ambulance. Notify the supervisor right away.