Job Hazard Analysis: Roof tear-off

Removing existing asphalt shingles, underlayment, drip edge, and flashing from a steep-slope residential roof down to the wood deck. Debris goes into a dumpster or trailer on the ground. Covers setup, roof access, tear-off, debris disposal, deck check, dry-in, and ground cleanup. Weather, roof height, slope, nearby power lines, and deck condition must be checked by the competent person before work starts.

Published 2026-10-23

A general example for this task. Your JHA should reflect your crew, equipment and site — review it with a competent person before work starts.

Steps, hazards and controls

  1. 1. Set up the site: place the dumpster, tarp the ground, and protect windows and landscaping.

    • Struck by the roll-off truck or a backing vehicle while placing the dumpster.Medium
      • Keep workers out of the truck's path until the dumpster is set and the truck has left.
      • Use one spotter in view of the driver for all backing.
      • Wear a high-visibility vest near moving vehicles.
    • Overhead power lines near the roof edge, dumpster, or ladder location.High
      • Locate all overhead lines before setup and keep ladders, tools, and debris at least 10 ft away.
      • If work must be closer, call the utility to de-energize or cover the lines before starting.
      • Use fiberglass ladders only; no aluminum ladders on this job.
  2. 2. Set up roof access and install fall protection: extension ladder, roof anchors, lifelines, and roof brackets.

    • Fall from the extension ladder while climbing or getting on and off the roof.High
      • Set the ladder at a 4-to-1 angle on firm, level ground and extend it 3 ft above the roof edge.
      • Tie off the top of the ladder and inspect rungs, feet, and locks before use.
      • Keep 3 points of contact; haul tools and bundles up with a rope or ladder hoist, not in your hands.
    • Fall from the roof edge while installing anchors before anyone is tied off.High
      • Install the first anchor at the ridge from the ladder or from a secured position, working away from the edge.
      • Nail anchors into rafters or trusses with the nails the manufacturer specifies, not just into the deck.
      • Competent person checks every anchor, rope grab, and lanyard before the crew goes up.
  3. 3. Tear off shingles and underlayment with roofing shovels, working from the ridge down.

    • Slipping on loose shingles, granules, or wet felt and falling off the roof.High
      • Stay tied off to the lifeline with a full-body harness at all times on the roof.
      • Keep lifelines short enough that you cannot reach the edge or hit the ground in a fall.
      • Install roof brackets with 2x planks as toe boards on steep pitches and below the work.
      • Stop tear-off when the roof is wet, icy, or in high wind.
    • Falling through skylights, chimney openings, or rotten decking.High
      • Cover skylights and openings with secured plywood marked HOLE or COVER before tear-off.
      • Walk on rafter lines and test soft spots before putting full weight on them.
    • Back and shoulder strain from prying and carrying heavy debris.Medium
      • Rotate shovel and carrying jobs among the crew every hour.
      • Keep loads small; do not stack debris piles on the roof.
    • Cuts and punctures from exposed nails and sharp flashing.Medium
      • Pull or hammer down nails as you go so the deck stays clear.
      • Wear cut-resistant gloves and boots with puncture-resistant soles.
  4. 4. Drop debris into the dumpster or trailer.

    • Workers on the ground struck by falling shingles, nails, or tools.High
      • Park the dumpster right under the drop point or use an enclosed chute.
      • Barricade and sign the drop zone; no one enters while debris is coming down.
      • Call out before every drop and get an answer from the ground.
      • Wear a hard hat on the ground at all times.
    • Leaning over the edge to throw debris and losing balance.High
      • Stay tied off and do not lean past the edge; slide debris off from behind a toe board.
  5. 5. Inspect the deck, replace damaged plywood, and dry in with underlayment.

    • Kickback and cuts from the circular saw when cutting out bad decking.Medium
      • Check the blade guard and cord before use; set blade depth to the plywood thickness.
      • Plug into a GFCI-protected cord and keep cords away from your feet and the edge.
      • Wear safety glasses while cutting and nailing.
    • Nail gun injuries from contact-trip firing or double fires.Medium
      • Use sequential-trigger nail guns and keep your free hand at least 12 in from the nose.
      • Disconnect the air hose before clearing jams or moving the gun.
    • Wind catching underlayment rolls or plywood sheets and pulling you off balance.Medium
      • Carry full sheets with two people and stop handling sheets in gusty wind.
      • Tear off only as much as you can dry in the same day.
  6. 6. Work in heat: plan water, rest, and shade for the whole shift.

    • Heat exhaustion or heat stroke from sun and hot roof surfaces.High
      • Start early and schedule the hardest tear-off before the hottest part of the day.
      • Provide cool water and shaded breaks; drink a cup every 15–20 minutes.
      • Let new or returning workers build up to full workloads over the first days.
      • Watch each other for dizziness, confusion, or stopped sweating and report it right away.
  7. 7. Clean up: remove fall protection last, sweep for nails, and close the dumpster area.

    • Falling while removing anchors and lifelines at the end of the day.High
      • Take down anchors last, working from the ladder or while tied off to another anchor.
    • Puncture wounds from loose nails in the yard and driveway.Low
      • Run a magnetic sweeper over the yard, driveway, and drop zone twice.
      • Keep walkways clear of debris and cords during the shift.

Required PPE

  • Full-body harness with lanyard or rope grab — On the roof at all times; inspect before each use.
  • Hard hat — For ground crew and anyone in the drop zone.
  • ANSI Z87.1 safety glasses — At all times during tear-off, cutting, and nailing.
  • Cut-resistant work gloves — When handling shingles, flashing, and debris.
  • Roofing boots with soft, puncture-resistant soles — For grip on the roof and protection from nails.
  • High-visibility vest — For ground crew near trucks and the driveway.
  • Hearing protection (earplugs) — When running saws, compressors, or nail guns.

Training

  • Fall protection training: harness fit, anchors, lifelines, and recognizing fall hazards, before working on the roof.
  • Ladder safety training: setup, angle, tie-off, and 3 points of contact.
  • A competent person on site to inspect fall protection, the deck, and site conditions.
  • Heat illness prevention: signs, water and rest, and how to get help.
  • Safe use of nail guns and circular saws, including GFCI use.

Emergency

If someone falls: stop all work, call 911 and give the full site address, and do not move the injured person unless they are in danger. If a worker is hanging in a harness, get them down within minutes using the ladder or rescue plan. Give first aid and send someone to the street to guide EMS in.